1. 250 volts
  2. 125 volts
  3. 30 volts
  4. 650 volts

On the surface of the mine/in an O/C mine the voltage may be raised to 250 volts.

  1. 250 volts
  2. 125 volts
  3. 30 volts
  4. 650 volts

Where hand held portable apparatus is used the voltage shall not exceed 125 volts.

  1. 10000 volts/6600 volts
  2. 12000 volts/6500 volts
  3. 15000 volts/6300 volts
  4. 11000 volts/6600 volts
  5. None of these

Electricity shall not be transmitted into a mine at a voltage exceeding 11000 Volts & shall not be used at voltage exceeding 6600 Volts.

  1. Manager
  2. Director of Mine Safety
  3. Director of the company
  4. Director (Pers.)
  5. Electrical Superintendent

Manager appoint electrical supervisor for a mine.

  1. Every day
  2. Once at least in every 7 days
  3. Once at least in every 15 days
  4. Once at least in every 30 days
  5. None of these

Effectiveness of the switch gear & protective system for automatic disconnection of electric supply to the mine, in case of a fault, shall be checked & recorded Once at least in every 30 days.

  1. One electrical supervisor
  2. One electrical supervisor for each district
  3. One electrical supervisor for each pit
  4. Adequate number of electrical supervisors as directed by the Inspector

Every mine should have Adequate number of electrical supervisors as directed by the Inspector.

  1. For at least 10 minutes
  2. For at least 1hour
  3. Until the person start breathing / until he is diagnosed dead by the doctor
  4. None of these

In case of electric shock, if the affected person is not breathing, Until the person start breathing / until he is diagnosed dead by the doctor should artificial respiration is continued.

  1. So that the joints are not touch one another & there is no chance of short circuiting
  2. To keep thickness of flexible cable uniform
  3. To preserve flexibility
  4. All of the above

When two/more conductors of a flexible cable are joined To preserve flexibility the joints should be widely separated

  1. Power cores
  2. Earth cores
  3. Pilot cores
  4. Power cores & Pilot cores
  5. None of the above

Flexible cable for portable apparatus shall have metallic screening on Power cores & Pilot cores

 

  1. 90 m
  2. 100 m
  3. 150 m
  4. 200 m
  5. None of these

cable with any portable & transportable apparatus shall not exceed 100 m