• Benches
  • Haul roads
  • O.B. Dumps
  • Workshop

Run-away ramps in mines can be seen at Haul roads

  • Toe
  • Crest
  • Foot
  • Edge

Sub-grade drilling is useful in removing Toe in opencast mine workings.

  • 2.0
  • 3.0
  • 6.0
  • 7.5
  1. Loose boulders or tree within 3.0 meters from the top edges of benches will be removed safety. 

 

  • Cushion blasting
  • Muffled blasting
  • Pop shooting
  • None of the above

To control the fly rock in the blasting Muffled blasting technique adopted

  • 9.0
  • 27.3
  • 35.3
  • 39.9

One cubic meter is equal to 35.3 cubic feet. 

  • 2.47 acres
  • 3.00 acres
  • 1.50 acres
  • None of above 

One hectare is equal to 2.47 acres.

  • Improve performance
  • Improve time of Blasting
  • To control fly rocks and group vibrations
  • None of the above

The main purpose of control methods of blasting in opencast mine is to control fly rocks and group vibrations.

  • Insert detonator into explosive cartridge
  • To check the cracks in shot hole
  • To clean the shot hole
  • All above

The Blaster’s tool known as Pricker made of wood or a non-ferrous metal is used to Insert detonator into explosive cartridge in blasting in open cast mine.

  • 4 to 6
  • 10
  • 12
  • Any number of buckets

Optimum Dumper and Excavator matching at 4 to 6 buckets of Excavator for optimum productivity in open cast mine. 

  • Form M
  • Form P-I/P
  • Form O
  • None of the above

Form P-I/P are the standards for medical examination for miners