Q) Effectiveness of the switch gear & protective system for automatic disconnection of electric supply to the mine, in case of a fault, shall be checked & recorded?

  1. Every day
  2. Once at least in every 7 days
  3. Once at least in every 15 days
  4. Once at least in every 30 days
  5. None of these
Solution:

Effectiveness of the switch gear & protective system for automatic disconnection of electric supply to the mine, in case of a fault, shall be checked & recorded Once at least in every 30 days.