- 100m
- 200m
- 300m
- 500m
Author: Sannith
No category found.
- Dragline
- Electric rope shovel
- Hydraulic shovel
- Dipper shovel
- Ramp construction
- Sump construction
- Providing berm
- All of these
- raising positions
- lowering positions
- float positions
- travelling positions
- High strength per unit mass
- High durability
- Fire and corrosion resistance
- Reusable
- Point load at the two points
- no loading between the two points
- uniformly distributed load between the two points
- uniformly varying load between the two points
- Zero
- Minimum
- Maximum
- Infinity
- The risk reduction on increasing the steps/day from 0 to 10000 is less than the risk reduction on increasing the steps/day from 10000 to 20000
- The risk reduction on increasing the steps/day from 0 to 5000 is less than the risk reduction on increasing the steps/day from 15000 to 20000.
- For any 5000 increment in steps/day the largest risk reduction occurs on going from 0 to 5000.
- For any 5000 increment in steps/day the largest risk reduction occurs on going from 15000 to 20000.
Top Contributors
Sannith
All Categories
- Central Electricity Authority Regulations (40)
- Drilling and Blasting (48)
- GATE 2024 (10)
- General (4)
- Geology (6)
- Mines Act 1952 (50)
- Mines Creche Rules (50)
- Mining Machinery (50)
- MINING MCQs (10)
- MMR 1961 (7)
- National Conference (7)
- Rock Mechanics (1)
- Surveying (1)
- THE MINES RESCUE RULES, 1985 (60)
- Winning and Working (22)